Spacenexus
In the same way that outlook items are linked to PB4 as thoughts, how about also linking MS project tasks into thoughts. If the possibility exists for PB4 to automatically read the due date and assign it in the PB4 calendar that would also be great.

With this functionaity, the detail within a traditional project file can be linked appropriately within the brain.

Would any other ms project users find this of practical use?

cheers

Jim
@200229:
TB8022 32bit
Java 32bit Version 8 Update 141

Testing 11.0.60.0

Firefox, Office 2013 Pro Plus 32bit
64bit Win10Pro
64bit Primary Laptop, 8GB RAM, Intel Core i7
64bit Secondary Laptop, 64GB RAM, Intel Xeon E3
Brain user since 1997
Quote

Newsletter Signup  Newsletter        Visit TheBrain Blog   Blog       Follow us on Twitter   Twitter       Like Us on Facebook   Facebook         Watch Us on Youtube  YouTube       

TheBrain Mind Map & Mindmapping Software     Download TheBrain Mind Mapping Software